Pressure Equipment EAC Certification Customs Union Certification
The technical regulation TR CU 032/2013 establishes unified safety requirements and marking specifications for pressure-bearing equipment. In accordance with TR CU 032/2013, pressure equipment and pressure vessels shall be designed and manufactured to eliminate potential risks during operation.
Compliance with TR CU 032/2013 is a mandatory prerequisite for placing pressure equipment on the Russian and Eurasian markets. Its provisions are harmonized with the European PED Directive 97/23/EC, but not fully equivalent.
Adopted: July 2, 2013
Entry into force: February 5, 2014
Since August 1, 2015, TR CU 032/2013 has replaced national standards such as GOST-R and GOST-K.
Equipment Covered by TR CU 032/2013
1. Vessels for compressed, liquefied gases, steam and liquids of Group 1 & Group 2 fluids;
2. Boilers and direct-fired vessels generating hot water or steam above 110°C with pressure over 0.05 MPa;
3. Pipelines for gas, steam and liquid media of Group 1 & Group 2;
4. Pressure-bearing components, assemblies and structural parts;
5. Valves applicable to Group 1 & Group 2 fluid equipment;
6. Indicating instruments and safety accessories;
7. Pressure chambers (excluding single medical chambers);
8. Protection devices and electrical components.
Equipment with a maximum allowable pressure exceeding 0.5 bar is covered by TR CU 032/2013.
TR CU 032/2013 Certification Process
Submit complete product technical documents. Our experts formulate certification solutions in line with pressure equipment regulations, guide document sorting and standard adaptation, and arrange sample testing or factory audit if required. The electronic EAC certificate will be issued within 3–4 weeks after approval.






Get More Information
